Hardware — Helpers
Helpers
One-time prep for parts used in multiple places on the machine. The assembly steps link here instead of repeating the procedure.
Nothing here is a stage of the build. Each page is one job you do once, on a part that several later steps need, and the step that needs it links straight to it. So read these when a page sends you, not in order.
Using a tool
- Using a multimeter. Continuity, resistance and DC volts, the three checks the pages below ask for. Each one links straight to the check it needs.
- Crimping connectors. The two kinds of crimp and their pliers, how to read the die, and the steps for each. Every lead page below links here.
Preparing a bought part
- Installing heat inserts. Pressing brass threads into printed parts, with a soldering iron or an insert press. The most-used page here: eight assembly steps call for it.
- Fitting T-nuts. How the M5 T-nuts go into the aluminum extrusion, and what changes if you bought the cheaper style.
- Preparing the Lazy Susan. Pulling the rubber feet off the bearing, if yours came with them.
- Preparing the 20-tooth timing pulley. Removing the top flange so the pulley fits the interface gear.
- Coupling a chute door to its servo. Fitting each door's servo adapter at first setup, with the servo at 0° and the door open. Once per layer.
- Soldering Pico headers. Optional. The parts list buys a Pico with its pins already on, so a standard build skips this page.
- Preparing the 3D printed cable cage plates. Optional. Gluing the printed pieces into the two cable cage plates, if you print them instead of having them laser-cut.
Making a cable
Seven of the machine's cables are made by hand, one page each. The eighth, the
USB hub's 24 V lead (PWR2), is a barrel plug screwed into the hub's own power terminal, so it needs no page.
- Preparing the LED strips (LED2a to LED4a, LED2 to LED4). Cutting a lamp's length of strip and getting its cable on the end, clamped or soldered. Three per machine.
- Make your own PSU output pigtail (PSU1 to PSU3). The barrel jack and its two fork terminals, for each of the PSU box's three outputs. Three per machine.
- Make the control board's 24 V lead (PWR1). Barrel plug at the PSU, JST-VH at the board. The one lead nobody sells ready made, so the harness order has it made, or you do.
- Make the Orange Pi's 24 V lead (PWR3). A barrel plug onto the buck converter's own input wires. The shortest of the three 24 V leads (
PWR1,PWR2,PWR3). - Make the channel stepper leads (STP1 to STP4). The four c-channel motor leads. The lead in the motor's box cannot be used as it comes. Four per machine.
- Make the chute stepper lead (CHU1). The chute motor has bare flying leads, so this one gets a tail and a housing.
- Make the chute limit switch lead (LIM1). Push-on tabs at the switch, a 3-pin housing at the board. Nothing soldered.
- Labelling the cables. The ID label for both ends of every cable, on paper in A4 or US Letter, or as flags for a Brother label printer. Each lead page above ends by sending you here.
Every socket these leads plug into is on connecting the components, and the drawings and lengths are on ordering the wire harness.