Tested variants
ExplanationAlternatives to the standard design that people have built or are trying, and where each one stands.
Everything on this page is a variant: a change to the standard Sorter V2 that somebody has made on their own machine. None of them is part of the build instructions in Hardware, and none is in the parts calculator. The results are what the people who built them reported, and the project has not measured them. Where a file exists, the variant links to it, or to the Discord message that has it.
Designs that were tried and dropped are on Abandoned ideas. Under each heading is the date of the latest report on that variant.
Belt feeder
Latest report: 6 September 2026.
What is different. A printed belt with raised catches on it carries LEGO up out of a large hopper and drops it into the feeder. It replaces the bulk channel (C1) and the second channel (C2), so the machine runs the belt, then C3 and C4.
How it is built. The belt is made of printed links that hinge on pins, in the style of modular plastic conveyor belts, and not of fabric, which is hard to buy. The links are 100 mm wide, and the catches are 70 mm apart and 4.2 mm high. The catches only have to hold a piece, not scoop it up, so their edges are chamfered on the back only and do not push pieces upwards. The belt climbs at no more than 45°, aiming for 35° to 40°, and then flattens out to carry pieces to the drop point. It runs on 608 bearings through a 4:1 gear reduction from a NEMA 17 motor, and slides on PTFE tube. It has no tensioner, because the weight of the belt keeps it taut. The pins are pieces of ABS filament: pins printed in PLA wore out.
What was tested. An endurance rig ran a 157 g weight on the belt at about 200 mm/s for 200 hours. Over that time an 11-link section stretched from 85.9 mm to 86.6 mm, measured at about 1.2 kg of pull. The belt survived. In a full machine the belt reached 2 to 4 parts a minute, held back by the belt slipping on its drive, so that figure says nothing about the layout itself. A standard machine has been reported at around 7 parts a minute.
Where it stands. It is still being worked on. The main drive shaft sheared when a piece jammed, and the drive and the frame were reworked since: a two-shaft drive was tried, and the new frame uses dovetails instead of most screws and no 2020 extrusion. The control software for it was not in the repository when last reported. The standard V2 is still the four-channel design.
A second builder runs a belt that feeds C3, and reports about 4 parts a minute with fewer double feeds, because the belt delivers pieces into C3 a few at a time.
- The endurance test: Conveyer longevity testing, a thread in the Discord
- Where it was last discussed: the 6 September meeting
- The standard feeder this replaces: C-channels
- Why the standard design has four channels: How the sorter is put together
Printed C1 legs instead of 2020 extrusion
Latest report: 14 September 2026.
What is different. The stand under the bulk channel (C1) normally stands on three legs cut from 2020 aluminium extrusion. The variant uses printed legs instead. A printed leg is the same part as the C2 and C3 legs, made longer: 228 mm tall, with the same 20 mm square ends that stand in the layout guide and take the dovetail adapter. The seat for the adapter ends up at the right height, so the drop to C2 is the same 80 mm as in the standard stand.
What was tested. The printed legs were tested by two builders, who each printed a set. Both report that the legs are stable. One found that, without any screws, they hold up better than the aluminium legs, and the other sees no reason to use extrusion instead. One of those machines was not running yet, so how the legs behave under vibration has not been reported.
Why the standard stand uses extrusion. The bulk channel carries a full bin of LEGO, and extrusion was chosen at C1 because printed legs wobbled under that load and took long to print. The standard stand therefore uses extrusion at C1, while C2 and C3 use printed legs. Whether the printed legs will replace the extrusion in the standard stand has not been announced.
The legs are not in the parts calculator. The file is an STL in the Discord thread linked below. If you pin a printed leg, it needs no T-nut: the M5 x 16 screw cuts its own thread in the plastic, as it does for the C2 and C3 legs.
- The file and a picture of the three legs side by side: the message in the Discord
- The standard stands, and how to pin one: Arranging C-channels
Orange Pi housing base without heat-set inserts
Latest report: 6 October 2026.
What is different. The standard base has eight holes that take heat-set inserts (small brass threaded sleeves pressed in with a hot tip): four under the Orange Pi, and four in the corner posts the roof screws into. In the variant all eight are smaller, 2.8 mm across instead of 4.0 mm, so the M3 screws cut their own thread straight into the plastic. That is the same size as the holes the roof already has for its own self-tapping screws. Nothing else changes, so it replaces the standard base.
Why it was made. It is quite hard to insert the heat-set insert for the board's post near the corner of the housing, because there is very little space to work there. Leaving the inserts out removes that step.
Screws. The same M3 x 6 screws hold the Orange Pi, and the same M3 x 12 screws hold the roof. They bite less deeply than into an insert: after the circuit board only about 4.4 mm of an M3 x 6 screw is in the post. If that feels loose, an M3 x 8 screw still fits.
Where it stands. The file was made on 6 October 2026. One builder has printed it and reports that it works well. If 2.8 mm is too tight or too loose on your printer, the size can be adjusted.
- The file: the message in the Discord
- The standard base and where the inserts go: Orange Pi housing
- Fitting inserts: Heat inserts
One 24 V lead for the hub and the Orange Pi's converter
Latest report: 16 October 2026.
What is different. The standard build gives each of the two loads its own lead from the PSU box: PWR2 to the USB hub and PWR3 to the 24 V to 5 V converter that powers the Orange Pi, each into its own jack. In the variant the two share one lead, which splits into two like a Y cable: one plug goes into one PSU box jack, and the hub and the converter are both fed from it. That leaves one PSU box jack unused.
What was tested. One builder runs their machine this way. The combined load has not been measured. The hub should draw about 1 A at 24 V and the converter about 1.2 A at the full 5 A it can give the Pi, so about 2 A through the one lead (both figures are estimates, not measurements). The PSU box jack and its plug are rated at 5 A or better. How the wires are joined at the plug has not been reported.
Where it stands. It is in use on that machine and nothing else has been reported. The build instructions keep a separate lead for each, and this variant is not part of them.
- The report: the message in the Discord
- The standard leads: Connecting the components
24 V to 5 V converter inside the Orange Pi housing
Latest report: 18 October 2026.
What is different. In the standard build the 24 V to 5 V converter sits on the roof of the Orange Pi housing, under its own clamp, and the lead from the PSU box ends in the converter's input wires. In this variant the converter is inside the housing, held against the inside of the south wall. The lead from the PSU box ends in a DC barrel jack in the west wall, the wall with the power key. A ready-made lead with a 5.5 x 2.1 mm plug at each end then runs from a PSU box jack to the housing. The jack's two leads are joined to the converter's input wires, and the converter's USB-C lead goes round the end of the board to the Orange Pi's power socket.
How it is built. Two walls change, the south wall and the west wall. The other parts, including the roof, are the standard ones, and the same two changes work on the Orange Pi 5 housing and on the Orange Pi 5 Pro, Max and Ultra housing.
- South wall. The buck clamp from the standard set is used as it is, turned to lie on the wall with its open side up. Two webs, 4 mm thick, on the inside face carry its four M3 x 12 countersunk screws, in the same hole pattern as on the roof. The pilot holes are 2.8 mm across and 6 mm deep, so the screws cut their own thread. The vent grille moves to the east end of the wall and is trimmed to 7 hexagons of the same size and spacing, so the clamp does not cover it, and the cutout in the bottom edge sits directly under it, 36.5 mm wide.
- West wall. A hole 11 mm across takes the jack, with a pocket 13.5 mm across and 2 mm deep in the outside face for the jack's flange. A boss 16 mm across and 3 mm thick on the inside makes the wall thick enough for the nut.
Sizes. The jack holes are sized for the jack on the Amazon DE listing the parts calculator links, a DC-099 with a 10.5 mm thread and a 12.4 to 12.5 mm flange. If your jack has a different thread, size the hole to it. The converter's own size is not published. The clamp has the buck clamp's 63.5 mm slot, and the webs hold it 4 mm off the wall, so measure your converter against that first.
What was tested. A first print of the two walls did not go back into the base: the clamp's web overlapped the column at the end of the wall's slot in the base. The files linked here are corrected, and were checked in software by lowering each wall into the base and the roof, with no overlap at any height. The screws also did not hold in the 2.8 mm pilots in that print, and that builder's roof has heat inserts where the standard roof has plain pilots. The version linked here has not been reported as printed. If the screws strip, the pilot holes can be opened to 4.0 mm and 6 mm deep for heat inserts, as in the base.
Where it stands. One builder is test printing it, and nothing has been reported from a running machine. The build instructions still keep the converter on the roof, and the walls are not in the parts calculator.
- The south wall: Orange Pi 5 and Orange Pi 5 Pro. The first is in the assembly orientation of the standard files, the second in the layout of the Pro set, with the wall flat.
- The west wall: Orange Pi 5 and Orange Pi 5 Pro.
- The idea and the discussion: the first message and the request for the self-tapping version, in the Discord
- The standard housing: Orange Pi housing, and the standard lead: the Orange Pi's 24 V lead
Single step feeder
Latest report: 20 September 2026.
What is different. It is meant to replace the feeder channels with a single step, a small platform that moves up and down on a linear rail and catches pieces out of a bulk pile. Its output wall is angled, so a single piece can be dropped more easily. It combines the hopper and the singulator (the part that separates pieces one by one) in one unit. The step is moved by a stepper motor with a toothed belt. The rail is used the other way round, with the platform held still and the rail moving, so the rail's stiffness steadies the platform. A V-shaped tray beside it can flip a piece onto a different side for more camera images before tipping it out, and a second servo can tilt the tray back above the hopper to return a double feed.
What was tested. In software-controlled runs it dropped single pieces straight from a bulk pile. Small pieces work well, and an assembled wheel, with its awkward centre of gravity, struggled to go up. No speed has been measured. The tray that empties it did not work yet at the time.
Where it stands. It is an early experiment, and the hopper is smaller than a standard bulk bucket. It is not meant to replace the standard feeder yet.
- The first video: the message in the Discord
- The discussion of how it works and what it can do: the message in the Discord
A position encoder on the chute motor
Latest report: 10 October 2026.
What is different. A small magnetic position sensor (an AS5600 encoder) is fitted to the back of the chute's NEMA 23 motor. The control board reads it over I²C and so knows whether the chute is really turning. The standard machine instead relies on the driver's stall detection (see The motors), which was not catching jams on that machine and needs tuning. The encoder needs no calibration. It fits under the sticker on the motor's rear shaft hole, with no drilling. A small converter board steps the 5 V down to the 3.3 V it needs.
Where it stands. It has been running since early September 2026, and its builder reported on 10 October that it is still on the machine and works well. It is only on the chute motor, because only there does the exact position matter.
- The first report: the message in the Discord, and a later one: the message in the Discord
- The explanation in the 6 September meeting
Printed layer frame pieces
Latest report: 4 August 2026.
What is different. Printed segments replace the three extrusion parts of each layer's frame: the crossbeam, the 90° bracket and the spoke. A full ring was put together on 4 August 2026. The builder found two small problems: a small gap between the segments, and a support that reaches slightly past the end of the bins, without touching the chute.
What was found. It does not yet win on printing time or weight. The benefit is that it needs no aluminium extrusion, and the segments could be trimmed to the areas that need them.
- The design, and the finished ring: the first message and the build report
- The standard frame: Hex frame
One long extrusion per leg
Latest report: 5 October 2026.
What is different. The standard machine cuts each layer's legs as separate lengths of extrusion. In this variant the layers are built first, from the printed parts alone, and one full-length extrusion is then slid through them for each leg.
What was found. It works well, but it gives up the modularity of the standard way, where you can add layers one at a time later.
- The comparison: the message in the Discord and the answer
- The standard stacking: Stacking the layers
Casters screwed straight into the extrusion
Latest report: 17 October 2026.
What is different. The standard bottom layer ends each foot extension (piece D) in a 2020 M6 foot connector, and the caster screws into the connector. In this variant the supplier cuts an M6 thread into the end of each piece D, and the caster screws straight into the extrusion. The 2020 M6 foot connector is left out, which is 6 fewer parts to buy.
How it is done. Order the extrusion from a supplier that offers an M6 thread as a service, and ask for the thread in the end of each of the 6 foot extensions when you order the cut lengths. The casters stay the same swivel stem casters with an M6 thread. barthel named two suppliers that cut extrusion to length and thread it: easy-systemprofile.de and motedis. You can also thread the ends yourself.
Where it stands. Two builders say it can be done, and the posts do not say whether a machine is standing on casters fitted this way. The depth of the thread was not given, and the stem of the caster in the parts calculator is 15 mm long. How the thread holds up under the weight of a loaded machine has not been reported.
- The suggestion, and the suppliers: the message in the Discord and a later one
- Threading the ends of the foot extensions instead of using the connector: the message and the answer
- The standard feet, with the connector: Bottom layer
Bin retainers with one joint screw and a hook
Latest report: 17 October 2026.
What is different. The standard retainers are held by two M5 x 16 screws each, four for a left and right pair. In this variant the pair is joined at the middle by one shared screw, and the far end of each retainer hangs in the T-slot on a hook instead of a second screw. That leaves one screw and one T-nut for a pair, so 6 instead of 24 for a layer.
How it works. The two retainers lock into each other at the joint: the left one has two prongs, the right one a tongue between them, and both end in a V that holds them in line along the rail and up and down. The screw goes through all three at the joint. At the other end of each retainer a J-shaped hook goes through the opening of the T-slot and sits behind the lip. To fit one, lift it about 2.4 mm, push the hook in and let it drop, so its top ledge rests on the top of the extrusion. The hook is wide and sits far from the screw, because the screw in the middle then holds the outer ends down. The hook ends are cut at 45°, so the retainer prints standing upright without supports. The small locating rib of the standard part is cut away along the whole length, because it would hit the extrusion while the retainer is lifted.
What was tested. A builder has printed and fitted the pair and reports that it works well. The earlier version, without the hook, was also printed and held moderate pressure with two screws. The hook has not been tested with a loaded bin. The slot of the extrusion in the drawing is not measured: it uses a 6.0 mm opening, a 1.8 mm lip and a 5.9 mm deep slot, so check the hook against your own extrusion with calipers before printing a whole layer.
Files. The left retainer carries the prongs and the right retainer the tongue, so the two files are not mirror images and cannot be swapped.
- The left retainer: bin-retainer-left-finger-v-wide-hook.stl
- The right retainer: bin-retainer-right-finger-v-wide-hook.stl
- The report: the message in the Discord, and the message the files were posted in: the message in the Discord
- The standard retainers: Bin retainers